{"id":7458,"date":"2023-06-02T14:34:54","date_gmt":"2023-06-02T12:34:54","guid":{"rendered":"https:\/\/oegjk.org\/?post_type=at_biz_dir&#038;p=7458"},"modified":"2026-03-12T11:17:23","modified_gmt":"2026-03-12T10:17:23","slug":"monting","status":"publish","type":"at_biz_dir","link":"https:\/\/oegjk.org\/sq\/unternehmen\/monting\/","title":{"rendered":"Monting"},"content":{"rendered":"<p>Nd\u00ebrmarrja Monting u themelua ne vitin 1993 n\u00eb Prishtin\u00eb si nj\u00ebra nga nd\u00ebrmarrjet e para private n\u00eb sektorin e Energjetik\u00ebs. Monting ka p\u00ebrvoj\u00eb t\u00eb gjat\u00eb dhe t\u00eb pasur n\u00eb realizimin e projekteve m\u00eb kapitale n\u00eb l\u00ebmin\u00eb e Energjetik\u00ebs dhe \u00ebsht\u00eb lidere n\u00eb tregun vendor. Monting ka marr\u00eb pjes\u00eb n\u00eb nd\u00ebrtimin ose rehabilitimin e 3 N\u00ebnstacioneve t\u00eb nivelit t\u00eb tensionit 400kV ,7 N\u00ebnstacioneve 220kV dhe 28 N\u00ebnstacioneve 110kV p\u00ebr KOSTT si dhe nd\u00ebrtimin e n\u00ebnstacionit 110\/33kV p\u00ebr parkun e Er\u00ebs n\u00eb Selac me fuqi 105MW .<br \/>\nMonting ka realizuar projekte t\u00eb shumta n\u00eb rekonstruimin e rrjetave distributive t\u00eb tensionit t\u00eb mes\u00ebm dhe t\u00eb ul\u00ebt n\u00eb t\u00ebr\u00eb territorin e Kosov\u00ebs p\u00ebr KEK dhe KEDS , dislokimet e linjave te projektet e autostradave,realizimi i projekteve n\u00eb ndriqimin publik p\u00ebr komuna etj.<\/p>\n<p>Monting ofron k\u00ebto sh\u00ebrbime:<\/p>\n<p>\u2013Dizajnimin dhe realizimin e projekteve n\u00eb nd\u00ebrtimin ose rehabilitimin e N\u00ebnstacioneve t\u00eb tensionit t\u00eb lart\u00eb 110kV, 220kV dhe 400kV;<br \/>\n\u2013 dizajnimi dhe realizimi i projekteve t\u00eb tensionit t\u00eb mes\u00ebm deri n\u00eb 35kV si: si:linjat n\u00ebntok\u00ebsore ,larg\u00ebp\u00ebr\u00e7ues\u00ebt,montimi i kthinave t\u00eb tensionit t\u00eb mes\u00ebm n\u00eb Trafostacione etj<br \/>\n\u2013 dizajnimi ,kompletimi si dhe montimi i Trafostacioneve 10(20)\/0.4kV dhe 35\/0.4kV deri 2000kVA<br \/>\n\u2013 dizajnimi dhe realizimi i projekteve t\u00eb tensionit t\u00eb ul\u00ebt si: realizimi i instalimeve elektrike n\u00eb objektet banesore,objektet industriale ,qendra sportive etj.<br \/>\n-realizimi i projekteve t\u00eb ndriqimeve publike,<br \/>\n-Shqyrtime :testimi me tension t\u00eb lart\u00eb deri n\u00eb 80kV DC dhe 60kV AC VLF i izolimeve t\u00eb linjave kabllore, kthinave si dhe pajisjeve tjera ,testimi i sistemeve t\u00eb tok\u00ebzimit si matja e rezistenc\u00ebs s\u00eb tok\u00ebzimeve dhe matja e tensionit t\u00eb hapit dhe prekjes ,shqyrtimi i qarqeve sekondare etj.<\/p>\n<p>Q\u00eb nga viti 2010 monting e ka hapur fabrik\u00ebn p\u00ebr prodhime t\u00eb produkteve metalike si :orman\u00ebt e tensionit t\u00eb ul\u00ebt ,sht\u00ebpizave t\u00eb Trafostacioneve distributive si dhe konstruksioneve metalike.Shumica e produkteve jan\u00eb t\u00eb qertifikuara me standarde IEC .<\/p>","protected":false},"author":1,"comment_status":"closed","ping_status":"closed","template":"elementor_canvas","atbdp_listing_types":[7],"at_biz_dir-category":[60,56],"at_biz_dir-location":[14],"at_biz_dir-tags":[],"class_list":["post-7458","at_biz_dir","type-at_biz_dir","status-publish","has-post-thumbnail","hentry","atbdp_listing_types-general","at_biz_dir-category-energie","at_biz_dir-category-produktion","at_biz_dir-location-prishtina"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/oegjk.org\/sq\/wp-json\/wp\/v2\/at_biz_dir\/7458","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/oegjk.org\/sq\/wp-json\/wp\/v2\/at_biz_dir"}],"about":[{"href":"https:\/\/oegjk.org\/sq\/wp-json\/wp\/v2\/types\/at_biz_dir"}],"author":[{"embeddable":true,"href":"https:\/\/oegjk.org\/sq\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/oegjk.org\/sq\/wp-json\/wp\/v2\/comments?post=7458"}],"version-history":[{"count":1,"href":"https:\/\/oegjk.org\/sq\/wp-json\/wp\/v2\/at_biz_dir\/7458\/revisions"}],"predecessor-version":[{"id":7460,"href":"https:\/\/oegjk.org\/sq\/wp-json\/wp\/v2\/at_biz_dir\/7458\/revisions\/7460"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/oegjk.org\/sq\/wp-json\/wp\/v2\/media\/12552"}],"wp:attachment":[{"href":"https:\/\/oegjk.org\/sq\/wp-json\/wp\/v2\/media?parent=7458"}],"wp:term":[{"taxonomy":"atbdp_listing_types","embeddable":true,"href":"https:\/\/oegjk.org\/sq\/wp-json\/wp\/v2\/atbdp_listing_types?post=7458"},{"taxonomy":"at_biz_dir-category","embeddable":true,"href":"https:\/\/oegjk.org\/sq\/wp-json\/wp\/v2\/at_biz_dir-category?post=7458"},{"taxonomy":"at_biz_dir-location","embeddable":true,"href":"https:\/\/oegjk.org\/sq\/wp-json\/wp\/v2\/at_biz_dir-location?post=7458"},{"taxonomy":"at_biz_dir-tags","embeddable":true,"href":"https:\/\/oegjk.org\/sq\/wp-json\/wp\/v2\/at_biz_dir-tags?post=7458"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}